Dynamic process simulation system saved money for plant start-up
 A
petrochemical complex under SINOPEC in east China built a styrene
unit and an aromatics unit. The processes with many control variables
were very complicated, especially for the mixed phase styrene reactor,
which was firstly used in the country. In this case how to train the
operators to familiarize the processes, master their features and
skillfully operate DCS before factory starting-up was very essential.
In collaboration with the factory people, HKD developed training simulators
for the two units, which were deployed in site a few weeks before
the units going into operation. The use of simulators to train the
operators made the factory start-up very successful and made a contribution
to saving money for the factory.
According to the factory's statistic, the use of simulators saved
factory's actual expenses for plant start-up training, DCS training
and other training about $123,457. However, It is of significance
that the use of simulators enable the factory people to gain the knowledge
for plant operation and for unpredicted or unscheduled shut down,
which could retrieve a loss of $2,407,000. The simulation system was
awarded the SINOPEC technology certificate.
Dynamic Simulation System Used For Plant Operation
HKD developed a PTA (350MT/y) simulation system and a monitoring
system on GPDMS platform for a petrochemical plant under SINOPEC. The
dynamic simulation system was used for training recruited and old operators
in normal and abnormal/malfunction conditions, and also used for DCS control
system design and startup procedure checking.
The use of simulation system and the monitoring system significantly gained
profit for the plant.
The operation experience gained by using simulators avoided a lot of abnormal
shutdown. The decrease in one hour of unscheduled shut down could retrieve
a loss of $29,400.
Dynamic Simulation System Used For DCS System Design
Checking And Startup Procedure Study
A petrochemical complex under SINOPEC applied the simulation system
developed by HKD to its ethylene unit revamp. The simulation system
was successfully used for:
- Control system checking and testing: Engineers of the plant found
some problems in compressor system, interlock loop and control loop
by using the simulation system, and solved them before startup, so
as to reduced risk as the plant went into operation.
- Checking new operation procedure: The simulation system played
important role in verifying the interlock scheme, designing startup
procedure.
- Training operators: The plant used the dynamic simulation system
to train 106 operators in the new ethylene process, startup/shutdown
procedures, DCS interface, interlock, etc.
|

Contact Information:
Telephone Number: 0086-10-64418357, 0086-10-64433410
Address: No. 5, Yinghuayuandongjie, Chaoyang District, Beijing, 100029,
China
Email: market@bjhkd.com
Copyright © 2007 Beijing
Huakangda Computer Application Technology Co., Ltd.
All Rights Reserved |